Shantou Jinping District Decentralized Integrated Sewage Treatment Project
Processing scale:72,000 m³/d
Effluent standard:First Grade A
Project Introduction:
In this project, the treatment of 15 important pollution sources including Jinping District Jingang Water Ditch, Shabei Drainage Canal, Shenxiang Wharf, etc. is carried out in the form of terminal integrated sewage treatment station, and the total design treatment scale is 72000 m³/d. The treated effluent meets the first grade A standard in the Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB18918-2002). The tail water after reaching the is discharged into the Meixi River after meeting the standard. During the transition period before the completion of the West District sewage treatment plant, it effectively alleviated the water quality pollution pressure on the Shantou section.
 
Project Highlights:
All 15 stations adopt integrated sewage treatment method, the construction is fast, the effluent is high-quality, and both standard and design capacity are reached in two months.

Contact Us

Request a quote for the sluge and wastewater treatment equipment.We will contact you within 72h.